how much water required in cum of concrete
-
HP Series Cone Crusher (Hydraulic)
HP series Cone Crusher (Hydraulic) adopts computer optimization design
-
PE Series Jaw Crusher
Based on years experience and technology development, A&C jaw crusher series are of 6 different models
-
B Deep Rotor Vertical Shaft Impact Crusher
B Series Deep Rotor VSI Crusher is a new generation and high effective product
-
Hammer Mill
The hammer mill (also called HM series coarse powder mill) is one kind of new high efficient grinding machine.
-
LUM Series Ultrafine Vertical Roller Mill
Base on A&C abundant experience in producing vertical grinding mill
-
MTM Series Medium Speed Trapezium Mill
A&C MTM Series Trapezium Mill is the world leading industrial mill
how much water required in cum of concrete Introduction
-
How much water is used in one cubic meter of .
On an average, 8cement bags weighing 50 kilos each is required to produce 1 cu.m of M25 grade concrete. Hence, considering 0.5 water:cement ratio, we require 200kg (almost 200litres) of water for cement weighing 400kg. Now, the above was a theoretical calculation for achieving a .
Get Price > -
Concrete Mix Design | Different Grades of .
17.05.2017· Hence We require 1326Kg of 20mm aggregate for 1m 3 of Concrete. Amount of Water Required for 1m 3 of Concrete:-For making concrete, required amount of water is added. Water quantity is depends upon the climatic factors and workability required. We generally maintain 0.35-0.50 of water cement ratio. Remember, above values may change according to ...
Get Price > -
How to Calculate Quantities of Cement, Sand and .
07.02.2017· and Aggregate required = 0.144*1450 = 209 kgs Considering water/cement (W/C) ratio of 0.55 We can also arrive at the Water required = 50*0.55 = 27.5 kg So, One bag of cement (50 Kgs) has to be mixed with 115 kgs of Sand, 209 Kgs of aggregate and .
Get Price > -
Compressive Strength Test of Concrete - .
Apparatus Required. Steel Mould (150mm x 150mm x 150mm) Tamping rod; CTM Machine; Trowel; Weighing machine ; Procedure Cube Casting Estimate the adequate ingredients to prepare the concrete with a proper water-cement ratio. Ensure that the cube mould should be free from dust and rust. Now, pour the concrete into the mould by proper compaction with the help of a tamping rod. Finish the top ...
Get Price > -
Compressive Strength Test of Concrete - .
Apparatus Required. Steel Mould (150mm x 150mm x 150mm) Tamping rod; CTM Machine; Trowel; Weighing machine ; Procedure Cube Casting Estimate the adequate ingredients to prepare the concrete with a proper water-cement ratio. Ensure that the cube mould should be free from dust and rust. Now, pour the concrete into the mould by proper compaction with the help of a tamping rod. Finish the top ...
Get Price > -
Water–cement ratio - Wikipedia
Too much water will result in segregation of the sand and aggregate components from the cement paste. Also, water that is not consumed by the hydration reaction may leave concrete as it hardens, resulting in microscopic pores (bleeding) that will reduce final strength of concrete. A mix with too much water will experience more shrinkage as excess water leaves, resulting in internal cracks and ...
Get Price > -
Water–cement ratio - Wikipedia
Too much water will result in segregation of the sand and aggregate components from the cement paste. Also, water that is not consumed by the hydration reaction may leave concrete as it hardens, resulting in microscopic pores (bleeding) that will reduce final strength of concrete. A mix with too much water will experience more shrinkage as excess water leaves, resulting in internal cracks and ...
Get Price > -
How to Calculate Cement, Sand and Coarse .
According to IS 10262 (2009), Assuming Water-Cement Ratio for the Concrete as 0.45. Required Amount of Water = W/C Ratio X Cement Volume. Therefore, Water = 0.45 X 0.3636 m 3 = 0.16362 m 3. Unit Weight of Water = 1000 litres/m 3. Required Amount of Water = 0.16362 X 1000 = 163.62 litres. Therefore, we need 10.5 bags of cement, 0.5454 m 3 of sand, 1.09 m 3 of Coarse aggregates and .
Get Price > -
Quantities of Materials Per Cubic Meter of .
there is no exact quantity on how much water u should sprinkle on the structure once u start curing the concrete. The sample once it settled at 24 hrs after casting, is immersed to the curing tank until the time of testing (28 days). From there u can deride that the structure should be all throughout wet to attain the needed strength at 28 days.
Get Price > -
Water in Concrete | For Construction Pros
Water is a key component in concrete. However, too much water can be detrimental to both the fresh and hardened concrete properties, especially strength, long term durability and potential for ...
Get Price > -
How much cement is used in 1 cum? - Quora
"It is observed by the experiments and experience that the volume of dry materials required for one cu m of wet concrete are 1.54 cu m because when water is added to the dry mix, the cement goes into the voids of dand and both together go into the voids of aggregates to become a s
Get Price > -
Requirement of Water for curing of concrete - .
The higher amount of water is required to continue the hydration process rather than making a concrete. Normally Hydration process will continue up to 21 days (for small structure i.e. houses) or more (for mass concrete structure i.e. RCC dam). Hence, concrete needs water continuously up to 21 days, to avoid dryness, and to maintain humidity. It significantly improves the overall quality of ...
Get Price > -
How many bags of cement do I need to make 1 .
Currently doing fence posts and some small concrete pads around the house so I need to self mix the concrete. I keep searching for this type of thing on the internet: Here is a good example of what is required from Boral's Site. From my learnings: 1 Cement 2 Sand 3 Aggregate (gravel) is too strong. 16bags (costly) 1 Cement 2.5 Sand 4 Aggregate is OK for fence posts. 13bags of cement per ...
Get Price > -
How To Calculate Quantities Of Materials For .
26.01.2017· Where volume of 50 kg cement = 0.0353 cum. 1 m3 water = 1000 Litre. Required water for 1 bag cement=0.0159 × 1000 = 15.9 Litre. ∴ Required water for 6.33 bags cement = 6.33 × 15.9 = 101 Litre. Summary: Cement = 6.33 bags. Sand = 0.44 cum. Aggregates = 0.88 cum. Water = 101 litre. Note: Yield of concrete is considered as 67% & Wastages of materials = 2%. You can use the same .
Get Price > -
What is the procedure to calculate cement bags .
Water = 1000 kg/cum = 1 kg/ltr.(Universal Constant) Considering a concrete mix proportion (by volume) 1:2:4:: cement: fine aggregate : Coarse Aggregate. Cement required = 01 bag = 36 liters (36 cc) = 50 kg. For batching ease, the farma/measuring box, dimensions should be selected to match volume of a cement bag i.e. 36 liter or 36 cc (cubic centimeter), as the cement is added per bag. Box size ...
Get Price > -
What is the method of calculation of water .
Quantity of water required for various mixes of Plain or Reinforced concrete can be taken between8 to20 % of weight of Cement (50Kg or P/Bag) in Gallons utilization of water may decrease or increase as per the envoirnment in which Conrete is prepared. Allowance for wastage can be taken10 to15% if Concrete being mixed at Site.
Get Price > -
Water for Construction - GharExpert
It has been observed many times that in spite of using best raw materials, cement and tested water; concrete does not provide required results. Engineers/contractors think that there is something wrong in cement, but they do not consider water cement ratio or quantity of water added in the mix. When the water is mixed in mortar, it reacts with cement and forms a binding paste which fills small ...
Get Price > -
Curing of Concrete - Its Methods, Time, & .
After placing of concrete, the water starts bleeding from concrete and rises from its pores. After rising of water, evaporation take place, and the water starts disappearing from the surface due to evaporation. Bleeding of concrete depends on many factors like thickness, length, temperature, etc. So, to reduce the loss of water and prevent shrinkage, initial curing of concrete is required ...
Get Price > -
Concrete Mix Ratios - Cement, Sand, Aggregate .
Concrete mix ratio of 1:3:3 – On mixing 1 part cement, 3 parts sand with 3 parts aggregate produces concrete with a compressive strength of 3000 psi.. On mixing water with the three ingredients, a paste is formed that binds them together till the concrete mix gets hardened.The strength concrete is inversely proportional to the water/cement ratio.
Get Price > -
Curing of Concrete - Its Methods, Time, & .
Theoretically, the water-cement ratio of 0.38 is required to hydrate all the particles of the cement and to occupy the space in the gel pores.
Get Price > -
How many liters water is needed for every cubic .
07.01.2012· For M20 mix R.C.C. maximum free water cement ratio is 0.55 in case of ordinary Portland cement therefore for 2400kg cement,maximum water needed will be 1320 kg / 5 cubic mix.
Get Price > -
Important Thumb Rules for Estimation in Civil .
The concrete ingredients will be vary based on the mix ratio. For Example, If the Plinth area is 100 Sq.ft (10 x 10) and the required concrete volume is 100 x 0.04 = 4 Cum with M5 mix ratio means. Now from the below table which is for 1 m3. Required Concrete ingredients for 4 m3 of M5 is. Cement – 2.77 x 4 = 11.08 bags. Sand – 0.48 x 4 = 1 ...
Get Price > -
Calculate Quantities of Materials for Concrete .
Consider concrete with mix proportion of 1:1.5:3 where, 1 is part of cement, 1.5 is part of fine aggregates and 3 is part of coarse aggregates of maximum size of 20mm. The water cement ratio required for mixing of concrete is taken as 0.45. Assuming bulk densities of materials per cubic meter, cubic feet and cubic yards as follows:
Get Price > -
What is Water Cement Ratio? Its Calculation .
Too much water can increase the workability, but it will also adversely effect the strength and durability of concrete. ... higher water cement ratio is required when concrete is hand compacted. In both cases, when the water cement ratio is below the practical limit, the strength of concrete falls rapidly due to introduction of air voids. Functions of Water in Concrete. As said, earlier water ...
Get Price >